Quantcast
Channel: OutSystems Community
Viewing all articles
Browse latest Browse all 1476385

[Forums] FullCalendarSample - Drag and drop and expand the events

$
0
0
Sophia Retief wrote:

Hi Grazina.  Wow, seriously impressed with prompt response. I appreciate it.   Thank you these changes are def closer to what I hope to achieve. 
However, I have set sloteventoverlap to true.  But if I look at month view and my events overlap I always only see 1.
If I drag and drop an event in the same timeslot as an existing event does not update the event. 
Another thing I noticed is that on some months when it wraps over into 6 weeks( see August 2015) then the first three days are missing.  I am assuming that it only displays 5 weeks.
Once again thank you
 Hi Sophia,

Year long reply... The representation of August 2015 is correct. You're probably looking at a calendar configured not to show weekends. 1st and 2nd August are not represented in that case.

Regarding the slotEventOverlap issue on month view, that is either a design decision done by Adam, on a bug, fixed in the meanwhile. 

Kind Regards,
Joao Grazina

Viewing all articles
Browse latest Browse all 1476385

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>